Franklin

IEEE recommended practice for cable installation in generating stations and industrial facilities [electronic resource] / sponsor, Insulated Conductors Committee of the IEEE Power & Energy Society.

Publication:
New York : Institute of Electrical and Electronics Engineers, 2011.
Format/Description:
Book
1 online resource (xii, 84 p.) : illustrations
Series:
IEEE Std.

Options
Location Notes Your Loan Policy

Details

Other Title:
IEEE Std 1185-2010 (Revision of IEEE Std 1185-1994)
Subjects:
Electric cables -- Standards.
Summary:
Abstract: Guidance for the proper installation of cable in generating stations and industrial facilities is provided. Keywords: American wire gauge (AWG), bend radius, cable, cable jamming, cable testing, cable tray, duct bank, ducts, English units, IEEE 1185, installation, jam ratio, kcmil, metric units, outside diameter or overall diameter (OD), pull back, pullby, pulling bend radius, pull tension, sidewall pressure, sleeve, training bend radius, trench, wire.
Notes:
"IEEE Std 1185-2010 (Revision of IEEE Std 1185-1994)."
"Approved 20 October 2010, IEEE-SA Standards Board."
"Published 14 March 2011 ; STD97028, STDPD97028"--P. [ii].
Title from title page (viewed June 13, 2011).
Includes bibliographical references (p. 82-84).
Contributor:
IEEE Xplore (Online service)
Institute of Electrical and Electronics Engineers.
IEEE-SA Standards Board.
Other format:
Print version: IEEE recommended practice for cable installation in generating stations and industrial facilities.
ISBN:
9780738164793
0738164798
9780738164809
0738164801
OCLC:
730243529
Access Restriction:
Restricted for use by site license.